The dream is almost realized. All the previous effort has finally come down to this. It’s time to bring all of the individual restored parts back together to create what has been fantasized about for a very long time.
The body parts are like new again, better really. The engine has been assembled and tested, actually broken in even. The interior either is new or looks like it again. The transmission, differential, and every suspension component have been returned to factory specs. The hundreds if not thousands of small parts, screws, nuts, clips and bolts, carefully documented during disassembly, are ready to hold everything together again.
No more waiting for this or that part to arrive or that process to be completed or research to be concluded. It’s time to assemble this thing. It’s time to realize the vision. It’s also time to reference all of the photo archives to confirm that each stage of the assembly process is 100% correct. Yes, the MCR assembly techs have done this many times before but there is no room for error now. Everything needs to be just right.
The first steps are generally to build a rolling chassis first. This makes the rest of the assembly process much easier. The rear suspension installation is a pretty straight forward bolt in but on A-body Mopars the front suspension, K-frame, engine and transmission are best installed from the bottom using a lift. This greatly reduces the risk of damaging any painted parts as everything goes in. The exception is with Hemi cars as the valve covers and exhaust manifolds are just too wide to fit in between the frame rails so they have to very carefully be lowered in from the top.
One might be naturally drawn to a systems approach of assembly but actually a layered approach will generally make things easier. Each component is added to the car when there is the best access for that part. An obvious example would be that the heater box goes in before the dash just like the A/C evaporator box, wiper motor, master cylinder and brake and fuel lines will go when the engine is out of the way.
Fenders, doors, hood and trunk lid and the glass are installed near the end but before the last of the interior goes into place. This is done so MCR can test the car for leaks when one wouldn’t endanger sensitive interior parts. Once the car is proven to be leak free then the last of the assembly and final inspection can proceed to the end.
Of course once the car is fully reassembled and checked over it’s not quite yet ready to be delivered. The last step is testing on MCR’s Mustang chassis dyno followed by some actual road miles to positively confirm that the dream is fully ready to be realized by the owner.
Remember, this car has been fully disassembled down to the last nut and bolt and it’s no small thing put that all back together again.